What's New Viewer - SAP S/4HANA

User Friendly Entry of Date Information

With this feature you can input a date in PMQ.Designer by an integrated calendar in all places where date input is offered. This makes it easier for the user to edit the dates. The calendar control can be opened using the icon Icon date picker on a date field. Free text entry is also possible in addition to the specific selection of a date.

Technical Details

Type

New

Available In

Available in all countries/regions

Scope Item

No scope item required

Application Component

FS-MPM (msg.PMQ)

Available as of

SAP S/4HANA 1809 FPS01