What's New Viewer - SAP S/4HANA

Output Management for Kanban Summarized JIT Calls

SAP S/4HANA Output Control is now available for Kanban Summarized JIT Calls, alternatively you can choose NAST-based output.

Output Control is based on Adobe® forms, form data providers, and BRF+ based configurations.

With the Schedule Kanban JIT Call Output app you can schedule background jobs for triggering the output of Summarized JIT Calls.

Technical Details

Type

New

Functional Localization

Not applicable

Scope Item

1E3 (Manufacturing with Kanban Supply into Production)

Application Component

PP-KAB

Available As Of

SAP S/4HANA 1909

Additional Details

You can start jobs to print or send e-mails for Kanban Summarized JIT calls immediately, or schedule them to start later.

You can schedule background jobs for triggering the output of Summarized JIT Calls where the dispatch time is set to scheduled.

The dispatch time is determined based on the settings in output control.