What's New Viewer - SAP S/4HANA

Production Execution Duration (SAP S/4HANA)

Use

With this app you can compare the planned and actual operation durations required for execution. The planned operation durations are defined in the manufacturing order and are calculated using the durations defined in the routing or master recipe. The time that was actually required for execution is recorded in the production confirmations. Using this app, you can easily compare these values. You can perform a step-by-step analysis for a specific time period and continuously fine-tune the production facility.

Technical Details

Technical Name of Product Feature

F2172_S4OP1610_FPS01

Product Feature is

New

Country Dependency

Available in all countries/regions

Application Component

PP-IS

Availability

SAP S/4HANA 1610 FPS01

Additional Details

You can use this app to do the following, for example:

  • Create your own visual alerts on KPI tiles for a specific time period and other related features.

  • See real-time data from different perspectives or dimensions.

  • Navigate with context transfers between chart views.

  • Make selections in charts and other representations.

  • Automatic time calculation to convert time from seconds to a convenient unit of measure.