Entry of Measurement Data After all the measurements were performed in the various work areas and the analysis results and measurement results are available, you can use this process to transfer the measurement data to your measurement project.
For samples that must be analyzed by an analysis lab first, you have the option of exporting the data for the respective measurement from the SAP system via an interface and of importing it back into
measurement management
again after the analysis.
You will find the prerequisites for export and import under Exporting and Importing of Measurement Data .
The process can, for example, include the following sequence of phases:
Checking and completing the planning data for the measurements and assigning tasks
Exporting and importing measurement data
Entering and editing the analysis results and the measured values
Editing the status of the measurements, for example, to document mismeasurements or measurements that were not performed or to identify partial measurements
Combining of partial measurements
Adding of measurements