Scheduling Jobs
Prerequisites
You have created a variant of the report program RMCADATA that uses dynamic date calculation to specify an analysis period.
Procedure
Carry out the following steps in the Computing Center Management System (CCMS).
-
Define a job with the job class A.
-
Create a step in which the variant you have defined for the ABAP program RMCADATA is executed.
-
Schedule the job periodically. Specify the length of the period so that it matches the analysis period set by the variant.