Dynamic Modification Rule

Definition

Basic data record containing the definition of the inspection stages, the dynamic modification time (at inspection document creation or after the inspection decision has been made), and the conditions for the inspection stage change.

The stage changes depend on the inspection results for inspection documents, that is, they depend on whether the inspection documents are accepted or rejected. The stage changes can also be specified in the dynamic modification rule.

Use

You can use dynamic modification rules to vary or dynamically control the inspection scope, whether an inspection is to take place or not.

Structure

A dynamic modification rule contains the following:

  • The definition of the inspection stages

  • The time of dynamic modification

  • The conditions that cause an inspection stage change

  • An optional reset period after which the system reverts to the initial inspection stage

The following options always apply to the conditions for an inspection stage change:

  • The OK case

  • The not OK case

The conditions are used to update the quality level, which always reflects the current status of dynamic modification.

In the inspection stages, you can define the inspection frequency and an inspection probability between 0% and 100%. This allows you to define inspection frequencies, for example: As long as the quality level is within an inspection stage, an inspection will be performed in 30% of cases and no inspection will be performed in 70% of cases. The system uses a random generator to determine when inspections are performed or not performed.