Inheritance of Inspection Specifications
Use
You can create as many inspection rules as required for each inspection object type. Each inspection rule is valid for a defined combination of values of properties that are relevant to the inspection object type and are flagged as relevant for inspection documents. Examples of properties are plant, material, and vendor. Examples of property values are the actual plant, material, or vendor.
The properties for an inspection object type have a predefined hierarchy that determines the order in which the system searches for the valid inspection rules. This hierarchy keeps the number of steps required to find the relevant inspection rule to a minimum.
Example
In the graphic, each hierarchy node (blue) represents the value of a property for the inspection object type or the inspection object type itself (in this case: Mat GR). The yellow rectangles contain the corresponding specifications from the inspection rule for the relevant value combination.
The determination of the inspection rule is based on the following principles:
-
The values of the inspection properties are evaluated individually or in groups. For example, all inspection properties for a sampling procedure are evaluated together. The sample-drawing procedure and the sample-drawing unit are also evaluated together. The inspection specifications for an inspection can originate in different inspection rules.
-
If no specific inspection rule exists for the combination of property values for the inspection object type, the system uses the specifications from the next higher-level inspection rule that it finds.
In the example above, the combination of sampling procedure 1, dynamic modification criterion 1, dynamic modification rule 1, and code group 3 is valid for the inspection decision for all inspections created for a material goods receipt (inspection object type Mat GR).
However, in plant 0001, the dynamic modification rule 2 is valid. This gives rise to the following combination: Sampling procedure 1, dynamic modification criterion 1, dynamic modification rule 2, and code group 3. This combination is valid in plant 0001 for all materials except material 4711 (sampling procedure 2, dynamic modification criterion 1, dynamic modification rule 2, and code group 3) and material 4712 (sampling procedure 3, dynamic modification criterion 1, dynamic modification rule 2, and code group 3).
A special code group (code group 1) for inspection decisions is valid for material 4711 in all plants and for all vendors.
This results in the following inspection specification determination:
|
Example |
Plant |
Material |
Vendor |
Sampling procedure |
Dynamic modification criterion (DMC) |
Dynamic modification rule (DMR) |
Code group (CdG) |
|---|---|---|---|---|---|---|---|
|
1 |
0002 |
4713 |
3000 |
SP1 |
DMC1 |
DMR1 |
CdG3 |
|
2 |
0001 |
4711 |
3000 |
SP2 |
DMC1 |
DMR2 |
CdG1 |
|
3 |
0001 |
4711 |
1000 |
SP3 |
DMC1 |
DMR3 |
CdG1 |
|
4 |
0001 |
4712 |
3000 |
SP3 |
DMC1 |
DMR2 |
CdG2 |