Executing an Allocation Cycle You can execute the allocation cycle in two different ways:
In the background (background processing)

Line item records are always written to the database when an allocation cycle is executed.
You have created an allocation cycle .
The system displays the
Execute <Allocation Type>: Initial Screen.
In the
Processing Options
area, you can determine how the allocation cycle is executed and which information is displayed:
Choose |
Function |
|---|---|
Background processing |
Processing runs in the background. |
|
The system only generates a log. No data is changed, no new data is written to the database. |
|
List selection appears. |
|
Basic list is configured. The sender and receiver list information and the journal information can be displayed. |
You can use
Settings
to determine the functions that the system takes into consideration during execution.
You can use
Goto
to display previous processing. For more information, see Displaying Previous Processing. You can check whether an allocation cycle has already been processed for a ledger within a specific period.
To make currency settings, choose
Extras
Value Date
, and enter the key that you use to define exchange rates in the system.
You can determine the start period for cumulation.

This value specifies the period that forms the starting point from which the values are added up to calculate the tracing factors and the values to be allocated in the current processing period. Normally, this is period zero (balance carryforward).
You can get, save, or delete variants.
You can display a cycle overview.

You can get an overview of the current status of allocation execution with
Selection criteria
,
cycle information,
and
previous processing
.
You can process allocation cycles.
You can assign cycles to groups.
To execute cycles of an allocation type in parallel, these have to be assigned to various cycle run groups.
After you have entered all relevant data and have made all appropriate settings, choose
Execute
.
The
Display <Allocation Type> General Ledger Basic List
screen
appears. You can use the basic list to check the processing results.

For more information, see:
Executing Allocation Cycles
By choosing
<Allocation Type>
→
Reverse
, you can reverse the allocation cycle.
You can also reverse allocation cycles in background processing.