Assignment of Production Orders A production ordercan be either a PP production order, a CO production order, or a process order.
When you create a production order, the system proposes the profit center from the master record (plant segment) of the material being produced. Consequently, you usually do not have to enter it manually. For process orders, the profit center proposed is that of the main product in the order.
All the costs and internal cost allocations posted to the production order are passed on to the assigned profit center, along with the work in progress and the price differences posted when the production order is delivered or settled.
Each production order is assigned to a plant. Each plant, in turn, is assigned to a company code, which is assigned to a controlling area. This controlling area must be the same as that to which the profit center is assigned.
In the application menu, you assign production orders as follows:
For new General Ledger Accounting under
For information on how to assign production orders, see the Implementation Guide (IMG) for classic Profit Center Accounting or for new General Ledger Accounting, under
Assignments to Profit Centers
.