To open a data entry schedule
Procedure
- Open the package in which you want to enter data.
- On the
Schedules
tab, in the
All
schedules page, click the code or description of the data entry
schedule you want to open.
-
If the dimension values were not set when the schedule was designed, the Select dimension values dialog box appears.
Select the variables to be used when running the data entry schedule and then click Continue.
-
If the schedule contains several sheets, select the schedule sheet you want to open.
-
