Data Transfer to Multiple Components You can use report RCATSTAL (
Time Sheet: Transfer to Target Components
) to transfer time sheet data records to the following target components in one step:
Human Resources
(HR)
Controlling
(CO)
Project System
(PS)
Plant Maintenance/Customer Service
(PM/CS)
Currently, you cannot use the report to transfer data to
Materials Management
(MM) and
cProjects
.
To access the report choose .
Report RCATSTAL combines the functions of the data transfer reports for
Human Resources, Controlling, Project System,
and
Plant Maintenance/Customer Service
. Any selection options that apply to certain target components only are indicated accordingly.
If you have two separate systems installed, for
Human Resources (HR)
on the one hand and for
Logistics
and
Accounting
on the other, you must run the report for transferring data to
HR
in the
HR
system. You can then transfer data to
Controlling
,
Project System
, and
Plant Maintenance
/
Customer Service
in one step in the other system.
To be able to run the report, you must
Have made all the component-specific Customizing settings in the target components
Be authorized to execute the relevant HR, CO, PM/CS, and PS data transfer reports
Report RCATSTAL enables you to select data according to your employees' organizational assignment. You can select data for all employees assigned to a specific cost center, for example. This option is not available if you use the separate data transfer reports for the individual target components.
The table below lists the other selection criteria for report RCATSTAL. In each case, the criteria are only valid for specific components.
Option |
Meaning |
Valid for |
Order |
Maintenance or service order |
PM/CS |
Network |
Network number |
PS |
Document number |
Document number |
CO, PM/CS, PS |
Posting date |
The transferred records are posted with the date entered. |
CO, PM/CS, PS |
Posting date for cancellation |
The cancelled records are posted with the date entered. |
PM/CS, PS |
Number of tasks |
For optimum performance, you can distribute the data you want to transfer over several tasks. You specify how many tasks in this field. |
PM/CS, PS |
Number of lock attempts |
If another user is processing an order or network when you run the report, the order or network is locked. You can enter a
|
PM/CS, PS |
Log |
You obtain a detailed list of the transfers made to the relevant components. |
HR, PM/CS, PS |
Test run |
The data is read from the interface tables but not transferred. |
HR, PM/CS, PS |
Repeat transfer |
If errors occurred during transfer, because a personnel number was locked, for example, you can transfer the records again. |
HR |
Transfer without dates |
You want to just enter services, without this affecting the scheduling of the network. |
PS |
Ignore warnings |
We recommend this option if you have scheduled the report as a background job. It means that data is still posted even if it causes warnings to be issued during transfer. The report displays any relevant warning messages in the transfer log. If necessary, you must postprocess the data. If you do not select this option, no more data is posted from the time the warning is issued. |
CO |
Note
For more detailed information on these options, refer to the relevant field help.
The report transfers the data for each component separately and consecutively.
If you execute the report online, the system displays how many records were posted in a target component once the transfer to that component is complete. If you have selected the relevant option, the system issues a detailed transfer log. Choose
Back
to confirm the display or log and proceed with the transfer to the next target component.
Normally you will run the report as a background job however. Then you do not need to confirm each transfer. If you selected the
Log
option for your background processing, the system generates a spool list for each component.
If errors occurred during transfer, you must postprocess them, either from the
Time Sheet
or in the relevant target component. For an overview of the errors that occurred, you must have selected the
Log
option.
Caution
If you postprocess errors in the relevant target component and not in the
Time Sheet
, the time sheet data is no longer consistent with the data in the target component.
Call the report by choosing .
Enter the period and organizational criteria for the data you want to transfer.
Specify the
target components
to which you want to transfer the data.
Select additional selection options as required.
Choose
Execute
.