Activating Validations for Data Entry and PlanningAfter you have created Validations , you establish when and which of the validations are checked during the data entry or planning. Activation of validations also occurs in Customizing.
On the initial screen of the validation maintenance choose
or
Planning.
A table appears in which you make entries for the various data entry layouts or planning layouts, and where you can assign a single record validation and/or a matrix validation to each layout. If a validation field does not exist in the layout, the system issues a warning. You can also assign a validation rule directly when maintaining the sender structure. (For general information on data entry, see
Transaction Data
).
After you have entered data in a data entry layout or planning layout, choose . or At this time the validations you have activated for the layout are run. With a single record validation, only the new and changed data records are checked. With a matrix validation, however, all records are checked.
Note
Only period values are checked. This means that, if you enter values on the overview screen, and these are distributed across periods, then the figures of the period screen are checked rather than the figures you can see..
If the data does not correspond to one of the validation rules, the message created for it appears:
If there are only messages of type W (Warning) or I (Information), a log is written but the data is saved anyway.
If a message of type A (Termination) or E (Error) is present, the data is not saved.
During the data entry or planning you can check the validation by choosing or . This way you can see the messages before saving, and possibly correct them.
To see the validation logs: in the EC-EIS application menu choose ext. number contains the aspect and the entry layout, for example, 001/ABCD . You can also search generically for all the logs of an aspect, by entering 001/*. .
A list of the selected logs appears. To list the messages for each log, choose