Name of Chart: Downtime Trend under Loss Analysis

Chart Type: Line chart

Content:

This chart helps in comparing and analyzing the Scheduled and Unscheduled downtime trend for the selected Enterprise Hierarchy over a selected time range, trend type, shift and material

Based on the trend type selected the graph displays downtime values for last 3 trend type periods (days, weeks months, quarters or years) either before today or before the last date of the custom date range based for the time range selected.

Dimensions:

X-Axis: Time (Based on selected trend type and time range), maximum last 3 periods

Y-Axis: Downtime duration in minutes

Chart Elements:

2 lines built the line chart (order is based on chart legend from left to right):

1st (blue) line: Scheduled Downtime value in minutes for (max.) last 3 trend time periods of the selected time range

2nd (orange) Line: Unscheduled Downtime value in minutes for (max.) last 3 trend time periods of the selected time range

How to read the chart:

Bar chart helps in analyzing the distribution of both downtime types (scheduled and unscheduled) over last 3 trend type duration.

A full screen and more detailed version of the chart can be brought up by clicking on it.