Goods Movement into Stock Without PM Integration

Use

You want to remove a material from a technical object and place it into stock but without updating the hierarchy of the technical object. You can do this with the Business Add-In (BAdI) BADI_CCM_FULLY_EQUI.

Prerequisite

You have actively implemented the BAdI BADI_CCM_I_STRCT_CHK.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Plant Maintenance Next navigation step Maintenance of Technical Objects Next navigation step Configuration Control Next navigation step Installation and Dismantling of Components End of the navigation path from the SAP Easy Access screen.

  2. In the mode list field, select Goods Movement into Stock w/o PM Integration if the appropriate screen is not automatically displayed.

  3. Enter a material and choose Enter.

  4. Enter the required quantity, a plant, and a storage location.

  5. Enter either a reservation or a movement type.

    Enter a reference order, if required.

  6. Select an event type and a part status on the Notification tab page.

  7. If you want to simulate the removal before saving, choose Check. You can display a full screen application log. Choose Application Log to do this.

  8. Save your entries.

    Note Note

    You may have to activate the forced dismantling to override an error message issued by the system. In this case, choose Forced Installation/Dismantling and confirm the message in the following dialog box.

    A forced dismantling is only possible after the simulation of the dismantling has taken place.

    End of the note.

Result

  • The material is placed into stock without updating the hierarchy of the technical object(s).

  • If the corresponding Business Add-In is active, a notification is generated or updated.

See also:

Dismantling of Components .