Goods Movement into Stock Without PM Integration You want to remove a material from a technical object and place it into stock but without updating the hierarchy of the technical object. You can do this with the Business Add-In (BAdI) BADI_CCM_FULLY_EQUI.
You have actively implemented the BAdI BADI_CCM_I_STRCT_CHK.
Choose
from the
SAP Easy Access
screen.
In the mode list field, select
Goods Movement into Stock w/o PM Integration
if the appropriate screen is not automatically displayed.
Enter a material and choose
Enter.
Enter the required quantity, a plant, and a storage location.
Enter either a reservation or a movement type.
Enter a reference order, if required.
Select an event type and a part status on the
Notification
tab page.
If you want to simulate the removal before saving, choose
Check.
You can display a full screen application log. Choose
Application Log
to do this.
Save your entries.
Note
You may have to activate the forced dismantling to override an error message issued by the system. In this case, choose
Forced Installation/Dismantling
and confirm the message in the following dialog box.
A forced dismantling is only possible after the simulation of the dismantling has taken place.
The material is placed into stock without updating the hierarchy of the technical object(s).
If the corresponding Business Add-In is active, a notification is generated or updated.
See also: