Installing Equipment with Simultaneous Material Movement

Use

You want to remove a piece of equipment from storage and install it in a superordinate piece of equipment or in a functional location.

Caution Caution

This function is only possible for equipment with a material number and serial number.

End of the caution.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Plant Maintenance Next navigation step Maintenance of Technical Objects Next navigation step Configuration Control Next navigation step Installation and Dismantling of Components End of the navigation path from the SAP Easy Access screen.

  2. In the mode list field, select Install Equipment with Material Movement if the appropriate screen is not automatically displayed.

  3. There are different options available for entering the required data:

    1. Enter either a piece of equipment or a material and a serial number in the Install Object group box.

      • Enter either a reservation or a movement type.

      • Enter a reference order, if required.

      • Enter an installation location.

        Note Note

        If the actual configuration of the object concerned is linked with its master parts list , you can choose Get Installation Location to have the system propose an installation location. This function is only active if the fields for the installation location are not filled.

        End of the note.
    2. If you have maintained a master parts list for the object concerned, enter an installation location in the Installation Location group box, and choose Get Material to have the system generate a proposal for the material to be installed.

      • Enter the serial number of the material that you want to install.

      • Enter either a reservation or a movement type.

      • Enter a reference order, if required.

  4. If you want to simulate the installation before saving, choose Check. You can display the search result in a full screen application log. Choose Application Log to do this.

  5. Save your entries.

    Note Note

    You may have to activate the forced installation to override an error message issued by the system. In this case, choose Forced Installation/Dismantling and confirm the message in the following dialog box.

    A forced installation is only possible after the simulation of the installation has taken place.

    End of the note.

Result

  • The equipment is installed in the superordinate object and the corresponding material is removed from storage.

  • If the corresponding Business Add-In is active, a notification is generated or updated.

  • If you use the functions integrated in the Configuration Control Workbench , you may have installed the equipment in a structure gap . In this case, the structure gap is automatically deleted.

  • If a forced installation was used to install the equipment, a corresponding indicator is set on the Configuration Control tab page in the equipment master record.

See also:

Installation of Components .