Installing Non-Serialized Materials with Simultaneous Material Movement

Use

You want to take a non-serialized material from stock and install it in a superordinate piece of equipment.

Prerequisites

  • The superordinate equipment must be an equipment BOM header with Configuration Control usage.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Plant Maintenance Next navigation step Maintenance of Technical Objects Next navigation step Configuration Control Next navigation step Installation and Dismantling of Components End of the navigation path from the SAP Easy Access screen.

  2. In the mode list field, select Install Non-Ser. Mat. with Material Movement if the appropriate screen is not automatically displayed.

  3. There are different options available for entering the required data:

    1. Enter a material number in the Material group box.

      • Enter either a reservation or a movement type.

      • Enter a reference order, if required.

      • Enter an installation location.

      • Enter quantity to be installed.

  4. If you want to simulate the installation before saving, choose Check . You can display the search result in a full screen application log.

  5. Save your entries.

    Note Note

    You cannot choose forced installation for this mode.

    End of the note.

Result

  • The non-serialized material is installed in the superordinate object and the material is simultaneously taken from stock.

  • If the corresponding Business Add-In is active, a notification is generated or updated.

  • If you use the functions integrated in the Configuration Control Workbench, you may have installed the non-serialized material in a structure gap. In this case, the structure gap is automatically deleted or its quantity will be decreased.

Constraints

Interchangeability is not supported in this mode.