Using the Manage Master Data Application

You use this app to configure global parameters, and to import, view, and edit the possible values that are valid for each master data dimension. You can maintain values for user-defined dimensions and for custom dimensions by editing on the user interface or via CSV or XLSX / XLS file import. You can also add custom values to some dimensions with SAP-provided values in the same way.

Global parameters (including global currency and source system IDs) and user-defined master data are maintained as part of your initial business configuration. For more information on initial configuration steps, see: Initial Business Configuration - Master Data.

For a general overview of how data is structured, see: ESG Data Model in SAP Sustainability Control Tower - The Basics.

Prerequisites

The following role is required for this app:

Role

Description

Data Governance Specialist (SCT)

SUS_SCT_DataManager

For a complete list of roles in SAP Sustainability Control Tower, refer to Role-Based Authorization for Access Control.

For configuration steps for data replication, see:

Types of Master Data

We divide master data into two main categories:
  • Dimensions with User-Defined Values

    Some dimensions have no default values from SAP, and so you need to maintain the values that you want to use. You can do this using the Edit function on the UI or via CSV or XLSX / XLS file import. This is typically done as part of your initial setup, because until these values are maintained, you can't use many of the standard features of SAP Sustainability Control Tower. Editable dimensions always have Active status. If you maintain values by editing on the UI, the values are available in the system after you have saved your changes.

    For details of the dimensions that you have to upload values for, and the type of values you can upload (Boolean or String), see: User-Defined Values.

    Additionally, you need to maintain values for dimensions that you create yourself in the Manage Custom Dimensions app. You can do this by editing on the UI or by file import.

    You also need to define your reporting structures (legal entity, business location, reporting line). You can do this by file import, or by importing data from SAP Datasphere if the integration is configured. For more information about reporting structures, see: Reporting Structures

  • Dimensions with SAP-Provided Values

    These dimensions have defined values that are delivered by default by SAP. You can't delete or edit the SAP-provided values themselves, but in the majority of cases you can extend these dimensions by adding new values. You do this by using the Edit function in the app, or by file import.

    Editable SAP-provided dimensions always have Active status, because the default values are always available.

Viewing Dimension Details

If you select a dimension from the list without using the checkbox on the left, you're taken to a screen that shows you details of the dimension, including all the current accepted values, the current status, and who last changed the data.

The table shows the possible statuses:

Status

Description

Active

This is the status you always see for editable dimensions.

Import Not Started

You see this status for reporting structures and custom dimensions when master data values haven’t been loaded yet.

You need to maintain values via file import. Editing on the UI isn't available for these types of dimensions.

Import in Progress

The import is running.

Import Failed

The import process encountered errors or issues, preventing successful completion.

Import Completed - Errors Found

The import process was completed, but some errors occurred.

Import Completed – No Data Available

The import process has finished, but it didn't find or import any data.

Validation Pending

The import was successful, and the validation is pending.

Validation in Progress

The data imported is being validated to help ensure accuracy and completeness.

Validation Failed to Run

The validation process was supposed to start following the data import, but due to some issues, it couldn't commence.

Validation Completed – Errors Found

See the error log for details.

Publishing Pending

There's still some validation to be done on the uploaded data.

Publishing in Progress

The data, after being validated, is now in the process of being published (that is, being made live in the system).

Publishing Failed

The process of publishing the data encountered errors or issues, leading to an unsuccessful publishing attempt.

Published

The data has been published. This is relevant for values that are maintained via file import, and means that the values have been successfully imported, validated, and published, and are available for use across the system.

Read Only

This is the status you always see for non-editable dimensions with SAP-provided values.

Maintaining Values Using the Edit Function

With the exception of reporting structures, values can be maintained using the Edit function. You just select the dimension you want to edit, use Edit, and then Create or Delete values.

Field

Notes

ID

Use CAPITAL letters.

Use the prefix "Z_" (if you are an SAP customer) or "Y_" (if you are an SAP partner).

For example: "Z_EXAMPLE_VALUE"

Name

Enter the value that you want to use.

Source ID

This must be a source system ID that you have maintained in the Global Parameters section of this app.

If you want to leave the screen before you have completed your editing, you can navigate away and you are given the option to Keep Draft. If you choose this, your edits are kept in draft mode and the dimension is locked for 24 hours so that other users can't access it. The difference between this and Save is that you can keep a draft even if it has incomplete fields, or has errors.

When you Save your changes, the system runs a validation check. Any issues are highlighted on the screen, and when there are no issues, the changes are saved. The dimension status is changed to Active, and the new values are in the system and ready for use.

Maintaining Values via File Import

To maintain values by file import (required for reporting structures), take the following steps:

  1. Select a dimension using the checkbox on the left side, and then Import.

  2. Either browse for a file to import, or download a blank or sample template. These are provided to support you with your data preparation.

    You can import using either XLSX / XLS or CSV files. XLSX / XLS files work in the standard way, and typical date formats are supported. For CSV files, please ensure the following:
    • The first row contains header labels separated by comma ",".

      For example: ID,NAME,DESCRIPTION

    • Every other row contains data separated by comma (",").

      For example: 1,SAP,Software company

    • Every data row must have exactly the same column count as the header row.

    • There are no thousands separators (space or period).

    • For decimal numbers use a period as the separator ("3.14").

    • If the column contains a string value that contains a comma, the entire string must be surrounded by quotes.

      For example: 1,SAP,"Software company, producing ERP systems"

  3. If the import was successful, you'll see the status Validation Pending. Select Validate, and then if there are no issues you can Publish. The status changes to Published (or Active, depending on the type of dimension) and the task is completed.

  4. If there are any issues during this process, you'll see a change in the status and any errors in the data will be shown in the Error Log tab.

Maintaining Reporting Structure Values via Import from SAP Datasphere

The Import from SAP System function supports the import of master data values for reporting structures from SAP Datasphere using functionality provided by Sustainability Data Integration. To use this function, the integration must be configured and you must be using content version 1.8.0 or higher. Nodes and links are imported at the same time. After the data is imported, you need to validate and then publish it in the same way as if you imported the data using a file.

To import data via replication, take these steps:
  1. Select the relevant dimension and select Import from SAP System, then Import from SAP Datasphere.

  2. The replication object for the dimension opens in the Manage Replications app. If there's more than one object, you're navigated to the list of relevant objects and you can select the required item. Select Run Replication to run a delta replication or Run Full Load.

  3. The replication status progresses from Queued to Running to Successful. You might need to refresh the screen to see the status changes.

    This status refers to the replication to SAP Sustainability Control Tower. It doesn't indicate that there are no problems with validation of the replicated data.

  4. Navigate back to Manage Master Data.

  5. If the import was successful, you see the status Validation Pending. Select Validate, and then if there are no issues you can select Publish. The status changes to Published or Active, depending on the type of dimension, and the task is completed.

  6. If there are any issues during this process, you see a change in the status and any errors in the data are shown in the Error Log tab.

For the latest details on how to work with the Manage Replications app, including how to configure scheduled replications, see Manage Replications.

Maintaining Values for EU Taxonomy Master Data

Most EU Taxonomy master data can be uploaded via file import or by replication from another system. Some types of master data are imported in CPE-UM, please see the documentation linked below for details.

For information on these processes, see:

Adding Values to Dimensions with SAP-Provided Data

Dimensions that have Active status have SAP-provided values and are editable. You can add new values, but you can't change the SAP-provided values. There are two ways to edit these dimensions:
  • File Import

    You can add values to the dimension by simply importing a CSV or XLSX / XLS file with the new values. Under Templates, you can download a blank template to help you prepare your data. You only include the new or changed values in your file, you don't need to include the SAP-provided values. If you want to delete one of your values, you can't do this by file import, but you can just use the Edit button instead.

  • Editing on the UI

    Use Edit to open editing mode, and then use the Add and Delete buttons to make the changes you want.

If you want to leave the screen before you have completed your editing, you can navigate away and you are given the option to Keep Draft. If you choose this, your edits are kept in draft mode and the dimension is locked for 24 hours so that other users can't access it. The difference between this and Save is that you can keep a draft even if it has incomplete fields, or has errors.

When you Save your changes, the system runs a validation check. Any issues are highlighted on the screen, and when there are no issues, the changes are saved. The dimension status is Active, and the new values are in the system and ready for use.

Whichever editing option you choose, the requirements for the values are the same:

Field

Notes

ID

Use CAPITAL letters.

Use the prefix "Z_" (if you are an SAP customer) or "Y_" (if you are an SAP partner).

For example: "Z_EXAMPLE_VALUE"

Name

Enter the value that you want to use.

Source ID

This must be a source system ID that you have maintained in the Global Parameters section of this app.

Global Parameters and Snapshots

Global Parameters

When you first launch the Manage Master Data application, you're greeted with a popup message. This message informs you that you need to configure your Global Parameters to start importing master data.

The global parameters are:
  • Global Currency

    The currency that is used throughout SAP Sustainability Control Tower.

  • Unit of Measure Code

    Select either SAP Code (based on standard SAP UoM codes from table T006) or ISO Code. For details of each code, go to the Unit Of Measure dimension in the app, or see Unit of Measure Codes.

  • Customer Sources

    IDs that you provide to identify the source of data you import.

Snapshots

"Snapshots" are a function in the Manage Master Data app that record your reporting structures (that is, your organizational hierarchies, including legal entity, business location, organizational unit) at a given point in time. Snapshots are created automatically whenever you import new data for reporting structures (reflecting real-world changes in your organization). You can also create snapshots manually.

One snapshot is always defined as the current default, and all metric calculations always use the current default snapshot. When you import new reporting structure data, the system automatically creates a new snapshot, and then checks whether the existing default snapshot was manually or automatically created:
  • If the current default snapshot was automatically created, the system will replace it with the new automatically-created snapshot.

  • If the current default snapshot was manually created, the system will not replace it with the new snapshot. The manually-created snapshot stays in use until you decide to replace it with a different (manual or automatic) snapshot.

So, if you anticipate that you may want to import new reporting structures but not immediately use them in metrics calculations, then you should create a manual snapshot and set it as the default. Later, you will need to manually change the default snapshot at the point when you want to start using the new structures in the calculation of metrics.

If you want the system to automatically adopt the latest reporting structure data for use in metrics calculations, no action is needed. The system will automatically create new snapshots and set them as the current default.

You can change between the two approaches at any time by selecting a manual or automatic snapshot as the default as required.

To work with snapshots, select Snapshot then Edit. You then have the option to Create a new manual snapshot, and to change the default snapshot use the checkboxes.