Calculating OverheadYou have carried out the steps required for the calculation of overhead in Customizing for Product Cost Controlling
.
You have performed the following period-end closing activities in the relevant application component:
Template allocation
Revaluation at actual activity prices
Choose and then the desired subcomponent (such as Product Cost by Order
or Product Cost by Sales Order
).
Choose .
Choose between individual processing and collective processing, if applicable.
The screen Actual Overhead Calculation
appears.
Enter the required data.
Set the indicators for processing control as desired.
If you want overhead to be posted on a date within the period other than the last day, choose .
Choose .
The overhead is calculated.
The following postings are generated:
Overhead is applied to the cost object (product cost collector or manufacturing order).
The cost center (or order) is credited.
The costs are updated under the secondary cost element specified in the costing sheet in the credit.
If you are using the multilevel worklist, you can edit the objects that have errors in the monitor of the worklist. For more information, see Worklist Monitor.