Updating the Preliminary Cost EstimateChanges have been made to the routing.
Choose
The screen
Creation of Preliminary Cost Estimates for Product Cost Collectors
appears.
Enter data as required.
Choose .
The system updates the preliminary cost estimate in accordance with the data you entered in the selection screen.
The reporting point backflushes of the current period are converted.
See also:
For detailed information on conversion with changes reporting point structures, see the following section:
For general information on the preliminary costing for product cost collectors, see the following section: