Cycle SetCombination of maintenance cycles which can be used as a copy model for creating multiple counter plans.
You create a cycle set, to which you assign maintenance cycles. In these maintenance cycles, you define possible times or performance levels for planned maintenance, for example, monthly, every 6,213.71 mi.
When creating multiple counter plans, you can accelerate the creation process by specifying a cycle set as a copy model. You can delete cycles which are not required, but are copied into the multiple counter plan. Similarly, you can add cycles which are missing.
A cycle set consists of a:
Strategy header
Scheduling indicator
Cycle set
Maintenance cycles (for example, cycle duration, unit of measurement)
The cycle set contains no other scheduling parameters.