Displaying a Scheduling Overview from the Maintenance Plan

  1. In the maintenance planning menu , choose one of the following options:

    • Start of the navigation path Maintenance plans Next navigation step Display End of the navigation path

    • Start of the navigation path Maintenance Plans Next navigation step Change End of the navigation path

    • Start of the navigation path Scheduling Next navigation step Schedule End of the navigation path

  2. Enter the number of the required maintenance plan and choose Continue .

    You reach the Maintenance Schedule screen.

  3. To display the scheduling overview and simulation, choose Start of the navigation path Goto Next navigation step Scheduling Overview and Simulation. End of the navigation path

    You reach the screen with the selection criteria. Enter the required data and, if necessary, change the display variant: graphic, table, or table with navigation tree.

    Note Note

    If you have called up the scheduling overview using Schedule or Change maintenance plan , you cannot make any changes.

    If you display the graphical scheduling overview or simulation directly , you can make changes in the simulation mode.

    End of the note.