Displaying a Scheduling Overview from the Maintenance Plan In the maintenance planning menu , choose one of the following options:
Enter the number of the required maintenance plan and choose
Continue
.
You reach the
Maintenance Schedule
screen.
To display the scheduling overview and simulation, choose
You reach the screen with the selection criteria. Enter the required data and, if necessary, change the display variant: graphic, table, or table with navigation tree.
Note
If you have called up the scheduling overview using
Schedule
or
Change maintenance plan
, you cannot make any changes.
If you display the graphical scheduling overview or simulation directly , you can make changes in the simulation mode.