Display in the MRP Monitor
The determined stocking indicators or parameters can be stored in the enhanced material master view during the SLM run, and then read as part of an MRP monitor run. This means that the key figures can be displayed in the result list of the MRP monitor. At runtime of the MRP monitor, they are read from the enhanced material master view table. No calculations are performed. This means that a previous dispatching or execution of the stock level monitor or the BOM analysis is required.
The key figures and the resulting classifications can each be displayed in a separate column in the result list of the MRP monitor: