Stock Level Monitor
Determine the stocking level of your materials in a multilevel bill of material structure. The stock level monitor makes suggestions for the stocking level based on a systematic analysis.
The monitor determines various stocking indicators and thus generates a proposal for an optimized stocking level. You can use these suggestions for the stocking level in the MRP monitor to correctly assign corresponding MRP parameters such as planning strategies and individual/collective indicators using the rule set of transaction /SAPLOM/XMM_RULE.
For this SCM Consulting Solution, the following note exists: 1745268 
You can create error messages under this component: XX-PROJ-CON-SLM
You can find additional information (such as presentation slides) here: Materials