Main Functions of the MRP Monitor
The MRP monitor is an integral component of the SCM Consulting Solutions and serves as an add-on program to the SAP ERP system. Using the MRP monitor, you can classify your materials based on business methods (for example, ABC/XYZ analysis). The MRP monitor is also an instrument for monitoring master data and key performance metrics during day-to-day material requirements planning.
You access the MRP monitor using the following transactions:
/SAPLOM/MRP_D – Display transaction
/SAPLOM/MRP_L – Light Transaction
/SAPLOM/MRP – Main transaction
Alternatively, you can call the program via transactions SE38, SA38, or SE80 using the package name /SAPLOM/MRP_MONITOR.
This documentation is based on the structure of the main transaction /n/SAPLOM/MRP, which includes all of the functions. In contrast, transactions /n/SAPLOM/MRP_D and /n/SAPLOM/MRP_L only capture partial functions.
Features
The functions of the MRP monitor are defined by the function descriptions in SAP Support Portal.
In the event of problems, please create a customer message under the component XX-PROJ-CON-DM.
-
Classification of various analysis objects such as materials at the level of the plant, MRP areas, or storage locations according to the ABC/XYZ methodology
-
Classification according to other methods such as lifecycle, replenishment lead time, price, bill of material characteristics, warehouse characteristics (weight, volume), picks, forecast characteristics, and so on
-
Individually configurable data basis and periodicities (including independently of the logistics information system LIS)
-
Identification of special case materials
-
Analysis and mass update of MRP-relevant and forecast-relevant master data based on definable policies
-
Key figure determination in the area of MRP (for example, stock value, range of coverage, inventory turnover, slow-mover status, or dead stock)
-
Calculation of default values for the safety stock and reorder point based on various methods (mapping of the uncertainty of demand and replenishment lead time)