Plant Data Collection (PT-RC-PC) This component controls the transfer of confirmations to
SAP Time Management
from the following SAP application components:
SAP Production Planning
(PP) and
Process Control
(PP/PI)
SAP Plant Maintenance
and
SAP Customer Service
(PM/CS)
SAP Project System
(PS)
Confirmations recorded in
SAP Logistics
describe the progress of a job and are used for planning and controlling in
Logistics
. They also document the performance of the employee who carried out the work. This data affects the employee’s remuneration.
Plant data collection transfers the relevant employee data from the above
Logistics
application components to
Time Management
. This reduces the work involved in data entry.
An additional advantage is that target values and specifications are also transferred from
Logistics
along with the actual data. In this way, labor utilization rates can be determined when time tickets are created in
Incentive Wages
. The labor utilization rate affects the rate of remuneration, especially in piecework and premium wages.
When the confirmations are transferred from
Logistics
to
Time Management
, the data is written either to table EVHR or table LSHR. A plant data sequence number (PDSNR) is assigned to each entry in the tables.
Time wage types are formed during time evaluation in the
Time Management
component to be included in the gross calculation in
Payroll
. They are referenced in the gross part of payroll.
Time ticket data from
Incentive Wages
is also referenced in the relevant wage types in the gross part of payroll.
The data determined in the
Time Management
component can be accessed by the
Payroll
component. The
Payroll
data can be transferred to
SAP Controlling
for cost accounting.
Logistics
confirmations must be recorded with a personnel number or ID number if they are to be transferred to
Time Management
.
There are two methods of transferring data from
Logistics
to
Time Management
:
The confirmations recorded in
Logistics
are
time event-related
. The transferred data is stored in table EVHR in
Time Management
. The confirmations are then posted as work time events to the
Time Events
infotype (2011). Time tickets are generated from the work time events and can be transferred to
Incentive Wages
if required.
Note
This procedure is only used if posting confirmations from
Production Planning and Control
(PP).
The
processing duration
of production orders, maintenance orders, networks, and so on, is confirmed in
Logistics
. In other words, the confirmation specifies the time worked as a number of hours. The transferred data is stored in table LSHR in
Time Management
. The data can either be posted to
Incentive Wages
as time tickets, or to the
Attendances
infotype (2002) as attendances.
Note
You can only use this procedure if
Time Management
is integrated with all of the above
Logistics
components.
In most cases, confirmations are recorded at front-end time recording systems for plant data collection and uploaded to the relevant
Logistics
components in the SAP System. Certified interfaces provide the connection to the subsystem.
Data can also be recorded online in
Logistics
.