Procedure documentationEditing the Controlling Level

Prerequisites

You cannot change the Controlling level if there are procurement alternatives or procurement processes for that Controlling level that are already being used. A locked padlock symbol indicates that a Controlling level cannot be changed. If you want to change the Controlling level, note the restrictions in the following cases:

  • A product cost collector already exists for the Controlling level. In this case, you can only change the Controlling level after the product cost collector in question has been deleted.

    See also: Reorganization of Product Cost Collectors

  • Procurement alternatives that are used in a mixing strategy already exist for the Controlling level. In this case you can only change the Controlling level if you remove the procurement alternatives for the mixing strategies displayed.

Procedure

  1. Choose Start of the navigation path Accounting Next navigation step Controlling Next navigation step Product Cost Controlling Next navigation step Actual Costing/Material Ledger Next navigation step Environment Next navigation step Edit Controlling Level for Material End of the navigation path.

  2. Enter the plant and the material.

  3. The padlock symbol next to the relevant Controlling level is not locked.

  4. Position the cursor on the Controlling level that you want to change, and double-click on the symbol Change Controlling level.

  5. Choose a Controlling level from the selection window.