Changing Material Prices

Prerequisites

If the material ledger is active , the material prices of materials whose price determination indicator is set to 3 can only be changed at the beginning of the period before all price-relevant transactions.

If the material ledger is not active, you can change the material prices at any time.

Procedure

  1. Choose Start of the navigation path Logistics Next navigation step Materials Management Next navigation step Valuation Next navigation step Material Price Change Next navigation step Change Material Prices End of the navigation path

    or

    Choose Start of the navigation path Accounting Next navigation step Controlling Next navigation step Product Cost Controlling Next navigation step Actual Costing/Material Ledger Next navigation step Material Ledger Next navigation step Set Prices Next navigation step Change Material Prices End of the navigation path

  2. Enter data as required.

  3. An overview screen appears.

  4. Fill in the fields in the overview screen.

  5. Choose Save .

Result

Inventory is revaluated with all price controls, including valuation with standard price and valuation with periodic unit price.