public static class ProductionOrderItem_2.ProductionOrderItem_2Builder extends Object
public ProductionOrderItem_2.ProductionOrderItem_2Builder manufacturingOrder(@Nullable String manufacturingOrder)
Original property name from the Odata EDM: ManufacturingOrder
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder manufacturingOrderItem(@Nullable String manufacturingOrderItem)
Original property name from the Odata EDM: ManufacturingOrderItem
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder manufacturingOrderCategory(@Nullable String manufacturingOrderCategory)
Original property name from the Odata EDM: ManufacturingOrderCategory
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder manufacturingOrderType(@Nullable String manufacturingOrderType)
Original property name from the Odata EDM: ManufacturingOrderType
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder material(@Nullable String material)
Original property name from the Odata EDM: Material
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder productionPlant(@Nullable String productionPlant)
Original property name from the Odata EDM: ProductionPlant
planned order.this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder plant(@Nullable String plant)
Original property name from the Odata EDM: Plant
If the planning plant and production plant are identical then you need not enter the planning plant as well. The production plant is copied automatically.The planning plant can be used, for example, if Sales and Distribution is to be organized as an independent plant.
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mRPArea(@Nullable String mRPArea)
Original property name from the Odata EDM: MRPArea
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder quantityDistributionKey(@Nullable String quantityDistributionKey)
Original property name from the Odata EDM: QuantityDistributionKey
Depending on the context, this may be the distribution key for the quantity produced or the distribution key for component consumption.Kanban:In the kanban calculation profile, you specify the distribution key for the smoothing of the dependent requirements.
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder materialGoodsReceiptDuration(@Nullable BigDecimal materialGoodsReceiptDuration)
Original property name from the Odata EDM: MaterialGoodsReceiptDuration
location after receipt of the goods.this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder storageLocation(@Nullable String storageLocation)
Original property name from the Odata EDM: StorageLocation
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder batch(@Nullable String batch)
Original property name from the Odata EDM: Batch
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder inventoryUsabilityCode(@Nullable String inventoryUsabilityCode)
Original property name from the Odata EDM: InventoryUsabilityCode
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder goodsRecipientName(@Nullable String goodsRecipientName)
Original property name from the Odata EDM: GoodsRecipientName
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder unloadingPointName(@Nullable String unloadingPointName)
Original property name from the Odata EDM: UnloadingPointName
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder stockSegment(@Nullable String stockSegment)
Original property name from the Odata EDM: StockSegment
the strategy is assigned to the material in the material master.this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mfgOrderItemPlndDeliveryDate(@Nullable LocalDateTime mfgOrderItemPlndDeliveryDate)
Original property name from the Odata EDM: MfgOrderItemPlndDeliveryDate
This field only contains an entry if the production order was created by converting a planned order.
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mfgOrderItemActualDeliveryDate(@Nullable LocalDateTime mfgOrderItemActualDeliveryDate)
Original property name from the Odata EDM: MfgOrderItemActualDeliveryDate
The system sets the date automatically.
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder productionUnit(@Nullable String productionUnit)
Original property name from the Odata EDM: ProductionUnit
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mfgOrderItemPlannedTotalQty(@Nullable BigDecimal mfgOrderItemPlannedTotalQty)
Original property name from the Odata EDM: MfgOrderItemPlannedTotalQty
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mfgOrderItemPlannedScrapQty(@Nullable BigDecimal mfgOrderItemPlannedScrapQty)
Original property name from the Odata EDM: MfgOrderItemPlannedScrapQty
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mfgOrderItemGoodsReceiptQty(@Nullable BigDecimal mfgOrderItemGoodsReceiptQty)
Original property name from the Odata EDM: MfgOrderItemGoodsReceiptQty
this
.public ProductionOrderItem_2.ProductionOrderItem_2Builder mfgOrderItemActualDeviationQty(@Nullable BigDecimal mfgOrderItemActualDeviationQty)
Original property name from the Odata EDM: MfgOrderItemActualDeviationQty
It is updated when the operations are finally confirmed as soon as an operation quantity that varies from the plan is confirmed as the yield.If a production order is to manufacture 100 pieces and a quantity of 5 pieces is displayed in this field then you can expect anen Lagerzugang von 95 Stück erwarten.If this value is negative that means that you have produced more than you originally planned. In this case you can expect a correspondingly high goods receipt for the finished product.
the planned goods receipt.this
.public ProductionOrderItem_2 build()
Copyright © 2020 SAP SE. All rights reserved.