Retrieving a Reference Scenario

Prerequisites

Retrieve a reference scenario whenever you want to compare the figures in two different costing scenarios.

Procedure

  1. On the Change Personnel Costs: Overview Organizational Units screen, choose Start of the navigation path Scenario group Next navigation step Reference plan Next navigation step Loading End of the navigation path

  2. The Choose Reference Plan screen appears.

  3. Select a scenario group as follows:

  • Select a scenario group.

  • Choose Load .

Result

The costing figures from the selected reference scenario are shown in the Reference value column. The figures from the original scenario are shown is the Current amount column.