Show TOC

"Define pick/pack times"

In this IMG step you define the pick/pack times which are necessary for material availability.

The specifications depend on the following criteria:

(If it should be taken into account during delivery scheduling)
The weight group is determined by the SAP System on the basis of the order quantity of the schedule line.

Requirements

Shipping points, routes, and weight groups must be defined (see section Define routes and Define weight groups).

Actions

1. Clarify which pick/pack times your shipping department needs.
2. Define the pick/pack times for each shipping point, route, and weight group.