With a time profile you specify the various time periods for working in the project planning board.
The evaluation period defines the time frame for working with and displaying data in the project planning board.
Outside of the evaluation period in the project planning board, you can no longer work with or display data.
The planning period defines the time frame for carrying out current planning in the project planning board. The planning period can be smaller or the same as the evaluation period. The planning period is always in reference to the project start date.
In the project planning board, the planning period is displayed with a different scale on the time axis.
For each period you can specify using entry type the way you want to enter the date.
You can not make entries in the posting period or the factory calendar for the evaluation or planning periods.
In the standard R/3 System SAP has predefined the time profiles. You cannot delete them.
Define the time profiles according to your needs.