Show TOC

Overhead Rate

To define a new overhead key, proceed as follows:

1. Enter a 4-figure key in the "Overhead field and select the row/s in the "Costing Sheet: Change Rows: Overview" screen.
2. Choose "Overhead" in the "Navigation" group box and create your new overhead key
3. Assign your overhead to a Dependency and choose "ENTER".
4. Enter the individual overhead rates.
Each record consists of a validity period, the controlling area, the overhead type (actual, plan, commitment) a percentage rate and several condition fields, which are selected from the relevant condition tables via the dependency you entered.
5. Save your input.

You can also define or change individual overheads independent of the costing sheet. For details see Define percentage overhead and Define quantity-based overhead.