Use
Total planning covers the planning of all the materials that are relevant for requirements planning and includes the BOM explosion for materials with a bill of material.
You can use total planning for a single plant or you can use the scope of planning to control whether the total planning run is executed on a multi-plant level
Prerequisites
Only for multi-plant planning with scope of planning:
Features
Defining the Scope of Planning
Executing the Total Planning Run for the Scope of Planning
You can execute total planning with scope of planning either online or as a background job.

The planning run always has to be started with parallel processing.

With stock transfer or production in alternative plant, the system creates the corresponding planning file entries in the alternative plant. If the alternative plant is included in the scope of planning, the system continues to plan the materials in the alternative plant. If the alternative plant is not included in the scope of planning or if you plan for a single plant without entering a scope of planning, the system does not plan in the alternative plant.