Define selection profiles

A selection profile determines the sets to be used in structuring different selection screens.

You can specify the following sets:

In addition, a time interval (start/finish) is defined in the selection profile. The requirements which fall into this time interval are processed.

You define this time interval with a day counter which always relates to the current day.

Example

The initial set specifies which selection is carried out immediately after calling up the evaluation. For example, a set contains plant "0001" and a variable work center. The SAP System displays a field for entering a work center but you can no longer change the plant. Plant "0001" is always selected. The selected plant is displayed in the selection list.

This example deals with a multi set because two different fields are involved.

Requirements

You must have processed the menu option "Define sets".

Default Settings

Selection profiles are pre-defined in the Standard SAP System. You can use them in the information system to evaluate capacity requirements for all objects in a project.

All selection profiles for the information system start with "SAPPIS*".

Recommendations

You should use these selection profiles for standard evaluations.

Actions

Define the selection profiles.