Performing the Availability Check in Shipping 

When you enter a delivery, the system carries out an availability check on the material availability date if the availability check is activated using the requirements class.

Which Elements are Taken into Account?

The following elements can be taken into account during an availability check in the delivery:

Process Flow

The system determines the date on which the availability check should be carried out on the basis of the earliest material availability date of all the schedule lines in the delivery. If the system determines that insufficient stock will be available on that date, it responds as follows: