Settings for Interest Profile
In the interest profile, you can store the
following parameters for each interest indicator and currency:
- Conditions for the project interest
calculation:
- Time elapsed since the first posting (minimum
duration) and from which interest is calculated for the project or internal
order
- Threshold value (of the costs accumulated on a
project or internal order) as of which interest is calculated on the
project/internal order
- Period control for the compound interest
calculation
Activities
Store the rules for the interest
calculation.
Further
Notes
You have the following options for assigning an
interest profile to a project:
- As a default value in the Project System
Implementation Guide, for:
- The standard project definition
- In the Project System application
menu
If no interest
profile is stored in the project profile, you can store an interest profile in
the control data for:
- Standard project definition
In the Basic Data
menu, choose Standard structures -> Standard WBS -> Change -> Project
definition -> Details -> Control.
In the Operative
Structures menu, choose Work breakdown struc -> Change -> Details ->
Control.
The entry is copied
into the WBS elements as a default value.
In the Operative
Structures menu, choose Work breakdown structure -> Single element ->
Change -> Details -> Control.
You can assign an interest profile to an
internal order in one of the following ways:
To do this,
choose
- In the master data of the relevant internal
order:
To do this, go to
the Internal Orders menu and choose Master data -> Order ->
Change.
Further
Notes
The planned interest calculation takes no
account of the minimum duration and threshold value specifications.