Specify default
costing sheet for network
In this step, you assign the costing sheet to
the valuation variant.
Requirements
You must have maintained the valuation variant
and the costing sheet.
Further
Notes
The costing sheet is stored, via the valuation
variant, as a default value in the network type parameters. When you create a
new network, the system defaults this costing sheet, which you can change in
the application. To do this, go to the network header data and choose Goto
-> Network header -> Extra.
The following scenarios are possible when you
create a new activity:
- The activity is assigned to a WBS element
-> the system defaults the costing sheet from that WBS in the
activity
- The activity is assigned to a WBS element, but
no costing sheet is defined in the WBS element -> the system defaults the
costing sheet from the network header in the activity
- The activity is not assigned to a WBS element
-> the system defaults the costing sheet from the network header in the
activity
You can change the costing sheet as
follows:
- Network header: choose Goto ->
Network header -> Extra
- Activity: in the Control
detail screen