The project profile contains default values and other control parameters such as the planning method for dates and costs.
The data that you enter in the project profile will be copied into a project in its project definition or in the elements which can later be overwritten.
You can maintain the various profiles which must be present in the project profile in the implementation guide for the Project System and also in the cross-application IMG. For example, the settings for the graphic are made by choosing Basis -> Frontend Services -> Network/Hierarchy.
The values in the project profile determine the functionality of certain areas of the Project System and cannot be changed without careful thought. Do not change profiles and key from related functions which are defined in the project profile, such as the costing sheet or the results analysis key. These changes could effect existing objects.
You must maintain the following sections for the project profile:
In the standard R/3 System, SAP has predefined a project profile containing the most important control parameters.