Show TOC
Availability
Check
In the following steps you can make all the
settings necessary to configure the material availability check in
networks.
Whether an availability check is carried out
and its extent are determined by:
Note
- In networks, only those material components
which have the item category "L" (stock item) are checked.
- Each material that is to be part of the
availability check must be assigned to a checking group. This assignment is
carried out in the material master record on the MRP view.