scheduling
Industry-Specific Component Oil (IS-OIL)
The main objectives of the scheduling function
are as follows:
- Group deliveries into shipments
- Assign shipments to an appropriate
vehicle
- Optimize grouping of deliveries and shipment
processing with respect to cost, efficiency and customer service.
Portionierung
und Terminsteuerung (IS-U-BF-PS)
Planning and controlling of the following
functions:
- Meter reading order creation
- Determination of budget billing amount due
dates
Production
Planning and Control (PP)
In scheduling, the system calculates the start
and finish dates of orders or of operations within an order.
Scheduling is carried out in
- Material requirements
planning: The in-house production times and the delivery times
specified in the material master record are taken into account.
- Capacity planning: Scheduling
is carried out using routings. A distinction is made between lead time
scheduling, in which capacity loads are not taken into account, and finite
scheduling in which capacity loads are taken into account.
- Networks: Scheduling
calculates the earliest and latest dates for the execution of the activities
as well as the capacity requirements and the floats.
The following scheduling types
exist:
- Forward scheduling: scheduling starting from
the start date
- Backward scheduling: scheduling starting from
the finish date
- Scheduling to current date: scheduling
starting from the current date
- "Today" scheduling: a scheduling type which
can be used to reschedule an order if the start date is in the
past.
Industry-Specific Components for Hospitals (IS-H)
Scheduling of the admission of a patient at a
future date and time.