Show TOC
distribution
strategy
Production
Planning and Control (PP)
To distribute capacity requirements the system
uses a distribution strategy. This strategy determines:
- whether the capacity requirements are to be
distributed using the earliest or the latest dates of an operation
- whether the basic values of the distribution
function are to be used for discrete or continuous distribution
- on which time basis (factory calendar,
Gregorian calendar or working/ operating time) the system is to carry out the
distribution.