Bill of Material Transfer

In the following worksteps you make the system settings for BOM transfer.

You can create profiles for BOM transfer and specify reference points.

The activity

Define Fields in BOM and Activity as Reference Point is obsolete, since as from Release 4.6A there is a Reference point field in the BOM item and the network activity. However if you have defined fields in this activity, the system ignores the new Reference point field. Therefore you must delete existing entries in this activity so that you can use the new field.