Define screen
selection for work centers
In this step, you specify
- which screens you assign to a work center
category
- the sequence in which the SAP System should
display the screens
- whether scheduling types and cost elements are
maintained
- whether the maintenance of the screens is
mandatory
Example
You can choose between the following
screens:
- default values for the activity
- assignment to the HR system (for people and
qualifications)
Note
- Basic data must always be the first screen in
the sequence.
- Leave out functions that you are not using.
For example, you do not need capacity planning when maintaining master data
for the work center category. This simplifies the maintenance of master
data.
Default
Settings
In the standard SAP R/3 System, a screen
sequence is predefined for work center category 0006 - project
management.
Actions
Specify the screen sequence for each work
center category.