Select Content from the Business Process Repository
The Quick Guide lists all activities which you must perform, to select contents from the Business Process Repository (BPR) for your SAP Solution Manager project (minimum requirements). You can use it for quick reference or as a checklist.
You have set-up and configured the SAP Solution Manager.
Set-up the SAP Solution Manager System Landscape (transaction SMSY).
Example
For version 5.0 of the product SRM, you need several systems, which you assign to the following relevant products and main instances:
Product |
Main instance |
SAP cProject Suite |
cProject Suite |
SAP NetWeaver |
AS ABAP |
SAP NetWeaver |
BI |
SAP SRM (with SAP EBP) |
TREX |
SAP NetWeaver |
EP Content |
SAP SRM (with SAP EBP) |
Catalog Content Management |
SAP NetWeaver |
AS Java |
SAP NetWeaver |
XI Exchange Infrastructure |
SAP Solution Manager |
SAP Solution Manager |
SAP R/3 Enterprise |
SAP R/3 Enterprise Server |
SAP SRM (with SAP EBP) |
SRM Server |
SAP SRM Sus & Bidding Engine |
EBP SRM Server |
You use the systems in logical components. You create logical components (transaction SMSY) or choose the logical components predefined by SAP.
Go to the Solution Manager Project Administration (transaction SOLAR_PROJECT_ADMIN), to create your project and enter missing information. For example, assign the logical components from step 2 to your SRM project, and add information about project team members.
Create a project structure in the Business Blueprint (transaction SOLAR01), with:
Master data
Organizational units
Business scenarios
Proceed as follows in the configuration (transaction SOLAR02):
Perform the cross-scenario configuration
Perform the scenario and process-specific configuration, e.g. for your SRM project.
Note
Choose to ensure that the Business Blueprint and configuration data (transactions SOLAR01 and SOLAR02) is complete. Missing texts, e.g. names of transactions, are loaded from the component system into the Business Blueprint or configuration, by RFC Connection.
You have fulfilled all the prerequisites, and assigned the required content from the Business Process Repository, to your project. You can now test (transaction STWB_2) and go live with your project.