ProcessSelect Content from the Business Process Repository

 

The Quick Guide lists all activities which you must perform, to select contents from the Business Process Repository (BPR) for your SAP Solution Manager project (minimum requirements). You can use it for quick reference or as a checklist.

Prerequisites

You have set-up and configured the SAP Solution Manager.

Process

  1. Set-up the SAP Solution Manager System Landscape (transaction SMSY).

    Example Example

    For version 5.0 of the product SRM, you need several systems, which you assign to the following relevant products and main instances:

    Assign Products to Main Instances

    Product

    Main instance

    SAP cProject Suite

    cProject Suite

    SAP NetWeaver

    AS ABAP

    SAP NetWeaver

    BI

    SAP SRM (with SAP EBP)

    TREX

    SAP NetWeaver

    EP Content

    SAP SRM (with SAP EBP)

    Catalog Content Management

    SAP NetWeaver

    AS Java

    SAP NetWeaver

    XI Exchange Infrastructure

    SAP Solution Manager

    SAP Solution Manager

    SAP R/3 Enterprise

    SAP R/3 Enterprise Server

    SAP SRM (with SAP EBP)

    SRM Server

    SAP SRM Sus & Bidding Engine

    EBP SRM Server

    End of the example.
  2. You use the systems in logical components. You create logical components (transaction SMSY) or choose the logical components predefined by SAP.

  3. Go to the Solution Manager Project Administration (transaction SOLAR_PROJECT_ADMIN), to create your project and enter missing information. For example, assign the logical components from step 2 to your SRM project, and add information about project team members.

  4. Create a project structure in the Business Blueprint (transaction SOLAR01), with:

    • Master data

    • Organizational units

    • Business scenarios

  5. Proceed as follows in the configuration (transaction SOLAR02):

    1. Perform the cross-scenario configuration

    2. Perform the scenario and process-specific configuration, e.g. for your SRM project.

      Note Note

      Choose   Environment   Refresh Texts from Component Systems,   to ensure that the Business Blueprint and configuration data (transactions SOLAR01 and SOLAR02) is complete. Missing texts, e.g. names of transactions, are loaded from the component system into the Business Blueprint or configuration, by RFC Connection.

      End of the note.

Result

You have fulfilled all the prerequisites, and assigned the required content from the Business Process Repository, to your project. You can now test (transaction STWB_2) and go live with your project.