Start of Content Area

Component documentation Communication Between R/3 and R/2 (BS2000)  Locate the document in its SAP Library structure

Purpose

The following topics provide an overview about the prerequisites for the partner systems.

These prerequisites depend on whether the calling system is R/3 or R/2.

From R/2 to R/3

From R/3 to R/2

Note

As of R/2 Release 5.0D, you can also use an RFC call instead of a CPI-C call.