Purpose
An ABAP program in an R/3 System uses an RFC or CPI-C call to start an ABAP program in an R/2 System under DCAM or UTM on a BS2000 host, and exchanges data with this program.
Prerequisites
For more details on the RFC interface, refer to the documentation
Remote Communications.Using the CPI-C interface
For details on the configuration of TXCOM, refer to the relevant topic in the following documentation:
BC SAP Communication: ConfigurationFor details on configuration, please refer to the documentation BC - SAP Communication: Configuration under the topic Connection Setup to the R/2 System
Process flow
Once the above requirements have been met, select the target system with the Transaction SM59.
For more details on the RFC interface, refer to the documentation
Remote Communications.For details on configuration, please refer to the documentation BC - SAP Communikation: Configuration under the topic Connection Setup to the R/2 System