Function documentation Selecting Line Segments Locate the document in its SAP Library structure

Use

You can change the planning segment and visualization segments defined in the line hierarchy from the planning table.

Prerequisites

You can only define line segments as the planning segment or visualization segments if a sort buffer exists between the line segments.

Features

The following example clarifies which line segments you can select to be the planning segment or the visualization segments:

This graphic is explained in the accompanying text

In the standard system, the header of the line hierarchy (that is, the work center created for the production line) is set as the planning and visualization segment.

In this example, you can define segment 1 as the planning segment, for example. Then the system uses segment 1 for scheduling and displays segment 1 in the lower section of the screen at the material data instead of the production line.

You also define segments 1 and 4 as visualization segments. These line segments are displayed in the planning table in the upper section of the screen and in the sequence schedule.

For more information, see:

Defining the Planning Segment

Defining the Visualization Segment

 