Entering content frame

Object documentation Formula for SAC Calculation Payment Locate the document in its SAP Library structure

Definition

To calculate the Annual Extra Payment (SAC), the system uses the following formula:

 

(Increased pay + Gratuities/6)X Time worked/Planned time X 0.5 = /S02.

Integration

To specify the increased pay and gratuities (irregular compensation) for the half year you use the relevant payments in the SAC calculation.

The time worked refers to the time worked in the half year being considered for the SAC calculation.

Working time refers to the planned work time for the half year.

 

You store payment of Annua l Extra Payment (SAC) in the SAC wage type (/S02).

 

 

 

Leaving content frame