Use

The scheduling level defines which scheduling data will be used for lead time scheduling.

Integration

You use rate-based scheduling in repetitive manufacturing.

You use rough-cut scheduling in demand planning and preliminary planning.

Features

You can carry out lead time scheduling at three different levels:

You can also define additional parameters for detailed scheduling such as reduction, and the scheduling type (backward, forward) in Customizing for MRP.

 

Note

In MRP, you usually use the detailed scheduling procedure.