Process documentation Scheduling Locate the document in its SAP Library structure

Implementation Options

The system executes scheduling in MRP. During the net requirements calculation, the system determined the shortage quantities and material shortage dates. During the procurement quantity calculation, the system calculated the procurement quantities necessary for covering requirements.

During scheduling, the system determines start and finish dates for the procurement elements of materials that are produced in-house and for materials that are procured externally.

Process Flow

This graphic is explained in the accompanying text